Aramith heritage crest logoBelgian precision for measured play
Service methodology

Aramith Set Care from Commissioning to Rotation

A structured care program treats cleaning chemistry, polish residue, cloth condition, storage, and replacement balls as one controlled system.

Five service pillars

Incoming Inspection

Record format, series, visible damage, and set completeness before commissioning.

Cleaning Protocol

Use compatible products, measured dosage, clean pads, and complete residue removal.

Rotation Control

Track rack volume and avoid mixing replacement balls without a comparison check.

Table Diagnostics

Separate ball behavior from unlevel slate, contaminated cloth, cushion, or lighting issues.

Staff Training

Standardize handling, storage, inspection, and exception logging across shifts.

5control points
2surfaces assessed: ball and cloth
1documented baseline
24 hdry-condition hold before audit
Billiard room technician checking a matched ball set

Put your care cycle on paper

We can help translate venue traffic and staff capacity into a practical inspection schedule.

Discuss the service plan